Did I moan too much last time, I'll try not to moan too much again today.
Boiler man came again the long and short of it is, the boiler wasn't improved, he couldn't sort it. We've been advised to change the flue, but if it's still not working after that they'd send out the engineer to work his magic. Anyway plumber changed the flue, it needed a change in direction because of the extension and the we came home to a wonderfully warm house. Yes it's working ! and even better than it ever has.
I got up to day 5 so here's the rest of the run down so far:-
Day 7 (Tuesday) more wall
Day 8 (Wednesday) and more wall
Day 9 (Thursday) even more wall
Day 10 (Friday) the scaffolding went up and the fence went down between next door on the agreement that a new one is fitted (it needs a new one to be honest)
Day 11 (Monday) They came and so did the rain so they went, to be fair they did some work but it bucketed it down.
Day 12 (Tuesday) They came back to finish the wall that is now looking very tall. The plasters came back as well and put up a stud wall in our front room. Beautiful we now have a separate hall way (very small hall way but very neat) and only a slightly smaller front room that feels more private and cosy.
HALL
We're squashed into one room - squashed room made smaller
Day 13 (Wednesday) the Craig the Carpenter came and started with our roof rafters. Boy does he work fast, head down and off to work he went.
Day 14 (Thursday) More roof getting ready for the tiles soon I hope. We also had the pictures sent to us showing our choice of kitchen we've got to sit down and think about it, see if we're happy with it, is there anything we want to change.
Oh and here's some wellies
1 comment:
its good to watch your extension going up and what a lovely hall
Post a Comment